12 Replies Latest reply on Aug 26, 2010 8:49 AM by Bill Robinson

    Changing snapshot for Audit baseline

      Hi,

       

      I am trying to work out of it is possible to use a changing snapshop as the baseline for an audit job without manually editing the Audit job's snapshot as a master image.  You can schedule a snapshot job no problem, is there a way to make the latest snapshot the baseline / master image for a scheduled audit job ?

       

      I came across this in the archives;

       

      http://communities.bmc.com/communities/message/132452#132452

       

      Do these scrips do the job, they appear to give you a view on config drift over time, rather than achieve what I am trying to achieve above.  If i have a master server where updates are made to, I want the latest image saved as a snaphot and the associated audit jobs to be compared to the latest server configuration automaticallly, no manual editing of audit jobs.

       

      Many thanks.

       

      Jason.