3 Replies Latest reply on Jul 25, 2005 10:04 AM by Robin Spinks

    Running two jobs in parallel

      Hello,

       

      I have a Batch job setup to run two NSH scripts performing very simple file copy procedures. I need both scripts to run in parallel but at the moment it only works sequentially. I've tweaked various options against each job to enable parallel processes but this has made no difference. I've even tweaked the same in the preferrences menu to no avail.

       

      Can anyone help?

       

      cheers

      Frank