3 Replies Latest reply on Feb 17, 2020 3:59 AM by Darin Miyashiro

    Control-m Cyclic job scheduling

    Darin Miyashiro
      Share This:

      Hi,

      I have a cyclic job that runs every 5 minutes and runs everyday.

      The user wants to stop the job from running from

      5pm to 6:30pm.  Any idea how I would do this?

       

      I can create two separate jobs, one before 5pm and one after 6;30pm,

      but I was wondering if there is another way of doing this?

       

       

      Thanks

      Darin