3 Replies Latest reply on Nov 29, 2018 5:09 AM by Sushant Pradhan

    Scheduling - Control-M 9.0.18

    Apoorv Chaturvedi
      Share:|

      Hi ,

       

      Can we schedule a job in Version 9.18 in such a way that if the script in the job generates an output as in counts then only application team should receive the email notification irrelevant of the job is ended OK in Control-M .

       

      Requirement is that if the script in job doesn't  generates a value then application team should not receive the output attachment in the email .

       

      Regards

      Apoorv Chaturvedi