0 Replies Latest reply on Oct 12, 2018 6:29 AM by Manvendra Singh

    How i schedule in control m7-DO NOT load the jobs in the schedule the next weekday after Dec 25 or Jan 1, the next run should be 2 weekdays after (ie Weekday  1) This must be followed whether Dec 25/Jan 1 fall on a weekday or weekend.

    Manvendra Singh

      How i schedule in control m7-DO NOT load the jobs in the schedule the next weekday after Dec 25 or Jan 1, the next run should be 2 weekdays after (ie Weekday  1) This must be followed whether Dec 25/Jan 1 fall on a weekday or weekend.