1 Reply Latest reply on May 8, 2018 11:39 PM by gopal biswal

    Reg. prerequisites and Scheduling time

    gopal biswal
      Share:|

      Hi,

       

      I have a requirement in which I have a Control-M job which needs to be executed either by generation of it's Prerequisites or Scheduling time whichever is earlier.

      Any idea how to achieve this.

      Thanks.

       

      Regards;

      Gopal