1 Reply Latest reply on Nov 3, 2016 3:29 PM by Bill Robinson

    Adding Conditions when a job fails

    Karen Welner

      I have a set of 8 jobs they are all setup to run one after the other, except on the 4th job, if that fails it should kick off another job before continuing threw the rest of the setup.

      So if jobs 1, 2, 3, 4, 5 run and then job 6 fails, it should then go and kick off another job, and then continue on with the flow. I have added my out Condition and then setup the the On Do Actions from the job failure. I added the condition into the prerequisite job, only I do not see how this will work. There is not dotted line or any line from the out condition to the job that should then run.