      Hello,

       

      Quick general configuration question. I standardise my dates with ISO 8601 (Ex: 2014-04-21) so these come through on my computer locally when pulling reports, using the client, etc. I was wondering if there was a way to get Track-It to also standardise on this? Ex 2014-04-21 and a 24 hour clock)? Is it as simple as changing the server time settings or do I need to do any configuration elsewhere? Also, when I run reports, I always run them using Monday through Sunday as a week, however Track-It insists that the week starts on Sunday. Is this also just changing the time settings on the server?

       