0 Replies Latest reply on Apr 17, 2014 3:06 PM by Travis Newton

    Scheduling reports that require parameters

      Share This:

      I'd like to be able to schedule the Total Work ORders Opened by Month report to run on the first of every month but it requires parameters. Is there a way to modify the report in Crystal Reports to set a start date (say 2014-01-01) and use the first of each month as the end date or rather the date that the report runs (I'd schedule it for the first of each month).