Adriano Gomes
Hi All BMC Control-M Community members   As Many you like myself is following Control-M Automation API fantastic evolution since its first launch and have started projects under its very first… (Show more)
in Control-M
Joe Wade
Per https://communities.bmc.com/docs/DOC-103508, I'm trying to create a global variable that will dynamically resolve job specific values at job run time.   Using ctmvar on the Control-M server, I… (Show more)
in Control-M
Arthur Tennis Habana
Hi Everyone,   just want to ask if someone already posted on how to setup control-m alerts into Solarwinds uisng SNMP traps?   Thank You!
in Control-M
Kee Gan
I can see anywhere to change an existing job's job type.  There is just one job that I want to fail if it runs too long. Or I need to create a new BIM job.
in Control-M
Jonathan Lifschitz
Control-M MFT Enterprise - Setting up an AS2 Configuration - YouTube
in Control-M
James Tomblin
Doing some yearly maintenance and clean up of Control-O tables for batch jobs triggered by DNS  and I am wondering if there is a better way. There are thousands of rules so doing a one by one search… (Show more)
in Control-M
Sushant Sharma
Instead of defining a control variable in this way %%SET %%REGN     = %%SUBSTR %%JOBNAME 1 4 and then using %%REGN%%. to get the 1st 4 character of the job name, is there a way we can get the 1st 4… (Show more)
in Control-M
Rahul Panigrahi
Hello Experts,   I would like to suspend my NDP for more then 24 hours.is there any way to do it with out using resources, workload policy etc... Please advise (if we go for changing the NDP time… (Show more)
in Control-M
John Michael Paredes
I am trying to create a Folder with A Sub Folder and a job inside but it seems i am getting some error below are the details.   JSON Structure:   {   "Defaults": {     "Application":… (Show more)
in Control-M
Steven Franckaert
I would like to create a global variable via Rest API from an application, is this possible?
in Control-M