    Controlling number of Job`s execution in concurrent run

    himanshu khandelwal

      Hi Community Members,

      I have one requirement in which will need to control the number of Concurrent jobs running on the same host.

      The scenario works like this:

      I have one master job which triggers 10 normal jobs which run on same hosts, so what I want to do here is that,

      Out of those 10 jobs, I want to run 5 jobs after that the other 5 so that the server doesn`t overload much. By doing that out of only 10 jobs only 5 jobs run at a time on the host.

       

      So can we do that it in Control M

      I have tried doing that using Control resources, but not able to get the expected result.

       

      Thanks and regards,

      Himanshu Khandelwal