This document contains official content from the BMC Software Knowledge Base. It is automatically updated when the knowledge article is modified.
PRODUCT:
Remedy with Smart IT
APPLIES TO:
Smart Reporting 9.0 SP1
PROBLEM:
User Sync jobs fails in Smart Reporting 9.0 SP1
CAUSE:
Error in UDM:Execution Status job logs- "CreateUserInYellowfin.0 - ERROR : java.net.ConnectException: Connection refused: connect"
SOLUTION:
- Log on to BMC Remedy Developer studio.
- Select the workspace. When prompted, enter the BMC Remedy AR System server user name and password.
- From the File menu, choose Switch Mode, and then Base Development mode. Click OK on both alerts displayed.
- In the left pane, expand All Objects, and open Escalations.
- Under Filtering Options, select Name from the first and Contains from the second drop down list.
- Type RSR in the text box and press Enter.
- From the search results, open the RSR:UpdateCompletedStatus escalation.
- Under Execution Options, select the Days, Hours, and Minutes as per your requirement.
Article Number:
000101919
Article Type:
Comments