TSSA: Can Job schedules be disabled via a database update?

Version 1
    Share This:

    This document contains official content from the BMC Software Knowledge Base. It is automatically updated when the knowledge article is modified.


    PRODUCT:

    TrueSight Server Automation Suite


    COMPONENT:

    TrueSight Database and Migration


    APPLIES TO:

    TSSA 8.x



    QUESTION:

    Can Job schedules within TrueSight Server Automation (TSSA) be disabled or deleted by an update to the database?


    ANSWER:

    This typically would be desired when a copy/clone of the TSSA database is being setup in a new environment.  The documentation covers the steps which can be used to disable all Job schedules via execution of sql against the database here:
    https://docs.bmc.com/docs/tssa89/testing-the-upgrade-in-a-duplicated-environment-808905044.html#Testingtheupgradeinaduplicatedenvironment-Step3:Performpost-copyconfigurationchanges


    The documentation includes additional considerations when duplicating an environment as well.


    Article Number:

    000182315


    Article Type:

    FAQ/Procedural



      Looking for additional information?    Search BMC Support  or  Browse Knowledge Articles